Proven Revenue & Client Case Studies

Transparent campaign breakdowns, verified ad spend numbers, and exact architectural playbooks engineered for high-ticket local services.

| |
Commercial Concreting First 48 Hours
Single Lead in the First 48 Hrs

$250,000

From $213.21 AUD ad spend

First Class Concrete

Engineered a hyper-targeted commercial placement campaign. Captured an industrial builder tender inquiry resulting in a quarter-million dollar commercial contract within the first 48 hours of ad launch.

Pipeline Value
$319,250
Cost / Lead
$15.23 AUD
View Breakdown
Residential Slabs March - May Sprint
Total Pipeline Value

$290,000

From $657.51 AUD ad spend

Ozcrete

Built direct-to-consumer visual process timelapses combined with immediate automated qualification, generating 60 exclusive residential slab quote requests across 3 suburbs.

Quotes Generated
60 Quotes
Cost / Lead
$10.95 AUD
View Breakdown
Water Damage & Repair 10-Day Validation Sprint
Return on Ad Spend

22.3x

Closed $9,599 Repair Scope from $430.35 Trial Spend

Bathroom Renovators Group

Led with a low-friction $99 water damage inspection to bypass homeowner friction. Converted into a $9,599 shower base repair and touched $114,698 in total pipeline.

Total Ad Spend
$430.35
Closed Repair Job
$9,599
Read Complete Blueprint →

Want these systems installed into your operations?

We only partner with one operator per local trade territory to avoid conflict of interest. Apply now to check if your zone is available.

Apply for Territory Exclusivity